Stage 3: Conduct Risk Assessment (Model Risk)
In accordance with the previous ICH and ASME guidance (ICH Q9(R1), Q10, M15; ASME, 2018), a model risk assessment should be performed by considering both:
Model influence on the decision, and
Decision consequence if the model were incorrect.