Stage 9: Document Model for Regulatory Submission or Inspection
In accordance with previous guidance from ICH (ICH Q1, Q2(R2), Q10, Q12, M15), model development, verification, validation, assumptions, limitations, and lifecycle controls should be documented in a transparent and traceable manner. This documentation must align with expectations for clear communication of credibility to decision-makers and regulators.
Links:
ICH Q1: https://database.ich.org/sites/default/files/Q1A%28R2%29%20Guideline.pdf
ICH Q2(R2): https://database.ich.org/sites/default/files/ICH_Q2%28R2%29_Guideline_2023_1130_ErrorCorrection_2025.pdf
ICH Q10: https://database.ich.org/sites/default/files/Q10%20Guideline.pdf
ICH Q12: https://database.ich.org/sites/default/files/Q12_Guideline_Step4_2019_1119.pdf
ICH M15: https://database.ich.org/sites/default/files/ICH_M15_EWG_Step2_DraftGuideline_2024_1031.pdf